Oven Controller Schedule -1
Phase 1: (Nov. 8) (EERD, OCD, mwoc.sch, chgen test run)
Phase 2: (Nov.15) (STD’s, Event Table ET, and mwoc.dat Setup)
Phase 3: (Nov.22) (script file test inputs; action routine pseudocode specs)
Phase 4: (Nov.29) (build/test LCPrototype)
Phase 5: (Dec. 6) (run/demo LCPrototype)
Phase 6: (Dec.13) (State Process Table STP and Object Access Diagram OAD)